1.2 Cleanroom panel installation and handling
(1) Process cleanroom panels of various specifications according to the requirements.
(2) The cleanroom panel is sealed with reinforcing ribs around.
(3) Check the quality parameters at any time during the production process to strictly control the quality of the cleanroom panel.
(4) When loading and bundling, use waste materials to separate the bundling rope from the cleanroom panel at the uppermost bundling place, so as to prevent the notch of the cleanroom panel from being strangled.
(5) Handle with care when loading and unloading to avoid scratches on the cleanroom panel.
(6) The cleanroom panels are stacked according to the specifications, and the skids are laid underneath to prevent the cleanroom panels from getting damp, and the distance between the skids is not greater than 600mm.

panel installation1


Post time: Mar-23-2023